Peak AppsTools

Dropped kerb in Havering: the rules and fees

London Borough of Havering charges £261 to apply and wants a parking space at least 4.8 m deep and 2.4 m wide. The fee is not refunded. The crossing must be at least 10 m from a junction.

Read from London Borough of Havering’s own pages on 11 October 2026. Havering, except Transport for London’s red routes. The borough is also the planning authority.

Check your driveway against Havering’s rules

A sample frontage in 3D checked against London Borough of Havering’s rules: a 5 m drive with a car inside the boundary, the dropped kerb 4.5 m along the kerb, a street tree 4.4 m away with its 3.2 m clearance.
The sample frontage for Havering: 5 m deep, 3.2 m wide, a 2.4 m footway, 35 m from a junction. Meets the Havering rules entered, with points to check.

Havering’s rules, one by one

London Borough of Havering’s published criteria, read from its own pages on 11 October 2026 (rule set havering-2026-10-11.1).
RuleWhat Havering asksSource
Depth of the spaceThe off-street space must be 2.4 m wide by 4.8 m deep inside the property; with at least 3 m of width the depth can drop to 4.6 m at the very least. There must be clear access to the front door.LBH policy 2023, Policy, 3.10.1(a)
Width of the spaceAt least 2.4 m wide.LBH policy 2023, Policy, 3.10.1(a)
The crossing it buildsThe standard is 4.5 m along the kerb: two 0.9 m ramp kerbs and 2.7 m of dropped kerb, cut to 4.2 m (2.4 m dropped) only where the site forces it.LBH policy 2023, Policy, 3.10.1(d)
Distance from a junctionNot approved within 10 m of a junction, or where it affects a width restriction, island, refuge, pinch point or the zig-zags of a crossing.LBH policy 2023, Policy, 3.12.1
Street treesStreet trees are not removed, except on an arboricultural report; the precautionary area is 4 times the girth at 1.5 m, and all tree costs fall on you.LBH policy 2023, Policy, 3.13
Street lightsA lamp column should be at least 1.5 m from the foot of the transition kerb; a move goes to the street lighting team and is refused if it cannot be done.LBH policy 2023, Policy, 3.14
Other street furnitureAt least 0.45 m from the base of a telegraph pole, cable or BT cabinet or other furniture on the footway.LBH policy 2023, Policy, 3.16.3
Bus stopsNear a bus stop with a block-paved footway, likely refused.LBH policy 2023, Policy, 3.12.2
Pedestrian crossingsNot approved where it affects the zig-zag markings of a crossing.LBH policy 2023, Policy, 3.12.1
Parking bays and laybysFootway parking bays are removed; in a controlled parking zone, or where parking stress is high, a loss of on-street parking is generally refused.LBH policy 2023, Policy, 3.15 and 3.18
Grass vergesCrossings needing significant construction across wide grass verges or amenity areas are refused.LBH policy 2023, Policy, 3.4.2
A second crossingRefused where a reasonable rear or side access already exists; a new crossing must be at least 2.7 m from an existing one or join it at your expense.LBH policy 2023, Policy, 3.12.3 and 3.17
Fast roadsNot approved on a street with a posted limit of 40 mph or more.LBH policy 2023, Policy, 3.12.1
DrainageWater must drain to a garden area or a channel, not on to the highway; refused without adequate drainage.LBH policy 2023, Policy, 3.11 (Highways Act 1980, s.163)
Permission from the ownerThe landowner or freeholder must consent in writing; council housing land needs the housing officer’s written approval.LBH policy 2023, Policy, 3.3

What it costs in Havering

Havering’s fees as published, read on 11 October 2026. Councils usually reset fees each 1 April.
What you payAmountSource
Application feeCovers up to three site visits.£261LBH application page
Building the crossingThe council quotes after the inspection; the online form has an estimate calculator.quoted for your siteLBH application page

Havering builds the crossing itself. Only the council and its approved contractor build crossings in the borough; a kerb dropped by anyone else is removed at your expense.

Applying, and what happens next

  1. The council inspects and sends a quote with an estimated timescale; standard crossings are installed within 16 weeks of the application, those funded for disability within 4 to 6 weeks of approval.
  2. Quotes are valid for 3 months; after that a new application and fee are needed.
  3. Refusal reasons are given in writing; appeals go through the council’s complaints process.

London Borough of Havering: apply for a dropped kerb

Planning permission in Havering

The highway consent and planning permission are separate. Nationally, an access on to an unclassified road and a porous or drained hard surface are permitted development for a house; Havering adds:

The national planning rules for dropped kerbs

Also worth knowing in Havering

Questions

Does Havering refund the fee if it refuses?

No. The £261 is not refunded, so check the frontage against the rules first.

Can I use my own contractor in Havering?

Only the council and its approved contractor build crossings in the borough; a kerb dropped by anyone else is removed at your expense.

How long is a Havering approval valid?

Quotes are valid for 3 months; after that a new application and fee are needed.

Related

Sources: London Borough of Havering, Apply for a dropped kerb; London Borough of Havering, Domestic Vehicle Dropped Kerb Policy (April 2023); all read on 11 October 2026. National rules: Highways Act 1980, s.184, GPDO 2015, Part 2 Class B and Part 1 Class F. legislation.gov.uk and GOV.UK content is used under the Open Government Licence v3.0; council figures are quoted as facts with their source, not copied text. Not legal advice and not a decision: the council decides after its own site visit. Not affiliated with any council or government department.